Interstate 10/Interstate 95 Interchange Resconstruction

July 24 - July 30, 2010: New eastbound traffic movements should be in place by Monday, July 26. This includes opening a new flyover ramp from I-10 eastbound to I-95 northbound and a new exit at Forest Street for traffic from I-10 eastbound. Traffic on I-10 eastbound going to I-95 southbound will split from the left side of the roadway instead of the right, and there will be new lane designations for eastbound traffic from Roosevelt Boulevard (U.S. 17) going to I-95 northbound and southbound. I-95 northbound within the project limits WILL BE TOTALLY CLOSED on Monday, July 26 from 10 p.m. to 5 a.m. I-95 southbound within the project limits WILL BE TOTALLY CLOSED on Tuesday, July 27 from 10 p.m. to 5 a.m. The ramp from I-10 eastbound to I-95 southbound WILL BE TOTALLY CLOSED between 10 p.m. and 5 a.m. on Wednesday, July 28. The ramp from Stockton Street to I-95 southbound WILL BE TOTALLY CLOSED on Wednesday, July 28 between 10 p.m. to 5 a.m. Detour signs will be posted. The movement to I-95 northbound from Stockton Street is scheduled to reopen by July 26. Lane closings may occur at various locations within the project limits on I-10 and I-95 and on the side streets between 10 p.m. and 5 a.m. The anticipated completion time for this project is late 2010 or early 2011.

As of 07.23.10

I-95/S.R. 9A East Interchange Reconstruction near JIA

July 24 - July 30, 2010: Various ramps and traffic movements WILL BE TOTALLY CLOSED nightly between 9 p.m. and 5 a.m. from Monday, July 26 through Friday, July 30. Detour signs will be posted. Lanes will be closed on I-95 southbound within the project limits between 9 p.m. and 5 a.m. from Monday, July 26 through Thursday, July 29. The flyover ramp from I-95 south to S.R. 9A east should be finished this summer.

As of 07.23.10

San Jose Boulevard Traffic Signal Structure repairs from I-95 to Haley Road

July 24 - July 30, 2010: Single northbound lanes may be closed next week (Monday through Friday) from 9 a.m. to 4 p.m., and single southbound lanes may be closed next week (Monday through Friday) from 7 a.m. to 3 p.m. This project should be finished in the early fall.

As of 07.23.10

Emerson Street Traffic Signal Improvement between I-95 and Copper Circle

July 24 - July 30, 2010: No lane closings are schedule for next week. The project should be finished this fall.

As of 07.23.10

I-95 just south of the Fuller Warren Bridge Routine Bridge Inspection

July 24 - July 30, 2010: Various lanes will be closed in both directions on Sunday night, July 25 between 9 p.m. and 3:30 a.m. for routine bridge maintenance.

As of 07.23.10

I-95 at the Southside Boulevard Overpass Roadway Maintenance

July 24 - July 30, 2010: One southbound lane will be closed on Monday, August 2 from 9 p.m. to 4 a.m. for roadway maintenance.

As of 07.23.10

I-95 at various locations between Kings Road and Edgewood Avenue Roadway Maintenance

July 24 - July 30, 2010: Single lanes will be closed in both directions at various locations nightly between 8 p.m. and 5 a.m. from Monday, July 26 through Wednesday, July 28 for roadway maintenance activities.